New senior school building for years 11 and 12. Lysaght Klip-Lok roofing across the full scope, with QP working closely with Building Engineering through construction to resolve several design issues. Tight collaboration, clean handover.
New senior school building for years 11 and 12. Lysaght Klip-Lok roofing across the full scope, with QP working closely with Building Engineering through construction to resolve several design issues. Tight collaboration, clean handover.
Set-out, supply and install by QP Plumbing. In-house crew on site for the duration of the works. Coordinated with Building Engineering throughout. Handover walk-through with the head contractor and signed-off defects list before we leave site.
Drawings, specifications and head-contractor reference available on request.